Welcome to my life . . . .

This is a blog about my passion: dollhouses and miniatures. This particular blog was started to follow my miniature dream: to create a Victorian Mansion. But work on my Mansion is slow. Very slow. Sloth slow. Ice Age glacier movement slow. Why? Because I am easily distracted by other personal miniature projects (I have 50+ roomboxes and 15 dollhouses in various stages of incompletion) and because I work for a miniature shop and am often up to my elbows in miniature projects that aren't mine! So, I thought, some artists work in a particular medium (woods, watercolors, clay, oils, etc.), I work in progress . . . .
Showing posts with label Craft Publications Willoway. Show all posts
Showing posts with label Craft Publications Willoway. Show all posts

Friday, November 6, 2015

Willoway is Away!

The 1978 Craft Publications Willoway dollhouse went home to it's owner!
When the customer dropped this dollhouse off in early summer it was a little sorry looking:
Before
We were to do a full overhaul on it: remove all old fish scale shingles, fix up broken railings, reattach the back roof which had fallen off, paint everything, shingle the roof in new rectangular shingles, install wiring, coach lights, wallpapers, and flooring!
All Pretty!
The biggest repair work done on the front was the porch:
Before
After
And although the porch was the biggest repair job on the exterior, the shingling efforts really improved the look of the house.  It is funny how a simple shape can change the look of a house: This house needed rectangular shingles!  The fish scale shaped shingles were too whimsical or soft and did not give this house the presence it deserved.
Removing old shingles
Although cute, those old shingles needed repair and the customer (or whoever had started the shingling) had shingled differently than I would have: I prefer the main roof to be shingled first and then the peak/dormers should be done.  The customer picked rectangle shaped shingles to replace the old ones and I am so glad because I think it made the house look more impressive instead of "cutesy".
After
The interior needed attention too:
Interior needed some TLC
Although it was looking a little rough, the bare bones were better than I anticipated given that the outer walls were merely constructed out of siding material (if you look closely at the photo above you can see the siding lines on the interior of the right wall)!  But the wood was dry and kept sucking up our primer -- several coats of KillZ was needed to fully seal the wood!
Room sizes were very nice but the haphazard priming job previously done was detracting from some finer details such as the crown molding all throughout the house which we did not fully notice until it was time to wire the house!
First Floor Before
First Floor After

Second Floor Before
Second Floor After

Third Floor Before

Third Floor After
The only issues on the interior were the electrical (see our Electrical Issues here) and how difficult it was to wallpaper some of the long, narrow rooms (such as the hallway and center attic room).
Hallway is 21" deep and only 8-1/2" wide
Hallway After
Tiny little space
The center attic room has a tiny space all the way at the end of the room.  This tiny space was roughly 4" at the highest point and 6" deep (and, like the hallway below it, 8-1/2" wide).  Very hard to get my hands in there to wallpaper....
All wallpapered!
Luckily the customer picked a solid blue paper so I didn't have to fuss with a pattern when fitting it in to the small space!  Flooring was no picnic to get in there either.
Overall the interior came out fantastic:
Before
After, with back roof open
After, with back roof closed
I was so excited to work on this dollhouse because I have always heard of the 1976 Craft Publications Pepperwood Dollhouse (have customers who still come into the store today that are building one from the plans they bought), but did not realize the company had produced many different dollhouse plans!  I could not find any information about the Craft Publications Inc company (other than it used to be in Georgia) but I did find that the designer of their dollhouse plans was Jacqueline Kerr Deiber (who also designed those beautiful 1920's Roper Stove, Monitor Top Refrigerator, and Maytag style Washing Machine!).

So this wonderful dollhouse has received some proper TLC and will continue on for another generation or two of fun!



Wednesday, November 4, 2015

Bits and Pieces... (Part 4 of 4: Shingles)

So, at the request of a friend I took photos as we shingled the back of the Willoway because my friend believes hinges and shingles are a very intimidating combo.  (I don't blame her - hinges frighten me too).

The most important part of shingling with a hinge is planning.  We measure and mark our lines as least a few times before settling on the proper pattern.  A proper pattern?  Yes, a proper pattern (come on now, that's just fun to say over and over. Or maybe that's just the glue fumes talking).

You want the lines to end at the hinge with a large portion of the shingle showing (i.e. you don't want to be cutting your shingle in half right where the hinge break would be so space your lines accordingly.  Trimming a little off a shingle is okay, but cutting more than 1/4 of the shingle off will make the row look odd).  With this house, the entire shingle will be showing at the hinge row:
Proper Pattern in Pencil

Next you shingle as usual up to your hinge:
Next up: Hinge Row!
 Shingle up to your hinge (periodically remember to open your hinged panel to make sure it is still operational and the shingles aren't preventing it from opening; shouldn't be a problem but it's best to check and deal with any issues now as opposed to when it's all glued tight):
Then you dump on the glue (being careful to keep it out of the hinge mechanism because you don't want to prevent your hinge from doing its job):
 And keep shingling right along.  These shingles may take more time to hold down in place just to ensure that they are sticking well:
And keep shingling:
Next Up: Top Hinge Row!
Now the next row will need a bump at the bottom to give it the correct slant because this row will NOT be overlapping the row beneath it.  So, just like you do at the bottom of the roof, add a piece of strip wood to the roof:
Strip wood glued to edge where hinge break is in roof

Shingle up to hinge again (periodically remember to open your hinged panel to make sure it is still operational and the shingles aren't preventing it from opening; shouldn't be a problem but it's best to check and deal with any issues now as opposed to when it's all glued tight).  The shingle overlapping the hinge may need a cut out to fit around hinge (I use either an Exacto knife or the EZ Cutter):

Finish shingling the row:
Then finish shingling the house and top it off with a roof cap (or a Boston Lap pattern at the ridge).  Either glue fumes were getting to me or I just wanted an excuse to nap for a bit, but I needed some weight to hold down the roof cap while the glue dried: I only use the best tools here at work so I used myself!
Roof is all done and house is ready to be picked up!  The final recap of this Willoway Dollhouse will be published tomorrow or Friday . . . . in the meantime, can you quickly spot the hinge?
Hopefully the hinge blends in with the roof now.






Friday, October 30, 2015

Bits and Pieces...(Part 3 of 4: Flooring)

So, I've been working away on the Willoway!

This past week the house was wallpapered and flooring cut and installed.  The rooms were so deep that we had to connect two sheets of flooring.  I do this all the time, but a customer mentioned that he always had trouble matching them up and installing floors so I decided to do a blog post about it for anyone else who has issues.

First we polyurethane the wood floors.
Then we make a template of the dollhouse floor.  We do this by overlapping paper and taping them together until the floor space in the dollhouse is completely covered by paper.  (I know, we only use the best tools here at the store.)  Remember to write on the paper what room the template is for and which direction is towards the open end of the dollhouse as you want the nice manufactured edge (presumably the straightest edge) in the front where people will see.
By now the polyurethane is dry and you can match up the two floors.  Put them edge to edge.  They will not always match up great (i.e. there will be gaps):
Some gaps are visible which is why it is best to do this on a white table where gaps show thru the wood clearly.
If that happens, turn one of the floors around so the opposite edge is now against the other floor's edge.  Sometimes you will still see a gap in which case you will then need to rotate the other floor.  Basically, keep turning the floors as one edge will match up very nicely to the other floor's edge:
Butted up to each other and there are no visible gaps!
Now flip the floors over so you can tape the backs together where the seam is located:
Starter pieces of tape to hold the seam in place until the rest can be applied.

I go overboard with the masking tape to hold them together.
Now you have a large wood floor with no visible seams or gaps:
A 17" x 22" wood floor!
Pull your templates out of the dollhouse and arrange them on the large wood floor you have created:
I can cut two rooms out of this!
Put the edge of the template up to the edge of the wood floor and start cutting.  Actually, I freehand cut around the template but if you are feeling cautious I would recommend either pencil lining around the template and cutting along your line or taping the template in place so it doesn't shift while you are cutting.  Once the flooring is cut out you can test fit it in the house (usually there is a place or two that needs minor adjusting to get it to fit exactly right: paper is more flexible and forgiving than the wood sheet flooring so a few snips along the edge might be needed for a flatter, easier fit).

Use double sided tape or tacky glue to install your flooring:
Installed in the hallway and read to go! (Lower level has weights on that floor while the glue dries)
We also stained the stairs for the dollhouse.  But the pre-assembled stairs had a lot of glue that prevented the stain from taking to the wood in the creases:
Lots of raw wood gaps.
Customer wants to keep costs for this dollhouse reasonable (it is for a child to play with) so we did our usual "cheat" method and filled in gaps with a dark brown marker before we polyurethaned the stairs.  Doesn't completely cover all the gaps, but makes them less noticeable:
Some raw wood gaps are still there - may put another coat of marker on it
If there is time I will color the more noticeable gaps with marker again.  But it will be picked up Wednesday and I still have shingling to do.  Shouldn't be too bad except that tomorrow is Halloween, today are the kids' school activities relating to Halloween, and I don't work Sunday or Monday (and kids are off of school on Monday and Tuesday due to the end of the semester) so getting kid-free time here in the store to shingle will be tough, but I will get it done (or at least beg Mom to help and do some shingling)!  Interested in shingling with a hinge on the roof? Look for installment Bits and Pieces...(4 of 4) next week!

Saturday, October 17, 2015

Bits and Pieces from Everywhere (Part 1 of 4: Electrical)


I've been working on several projects this past week, and today's blog will be about the electrical issues of two of the projects.  My frustrations with electrical hit new highs this past week.

Personal Project was going along great: the microjacks were finally working  (Installing Electrical in Library Ceiling) and I was ready to move on to the next room!  Music Room electrical went fine!  I was on a roll!  Guest Room electrical went . . . . well, that's it.  It went.

I tried to install the first set of microjacks and they did not go in correctly thanks to my heavy soldering.  I tried to remove some of the solder but the constant heat and cool from soldering application and removal must have compromised the integrity of the microjack because when I tried to put them in, they snapped in half.  By then the first holes I had drilled were looking fairly sorry; I was thinking they must have been enlarged due to the installation attempts.  So I drilled new holes and tried to install a new set of microjacks (using only a dab of solder this time!).

New holes drilled next to old holes
Success!  They went in beautifully and my tester chandelier lit up great:

New Microjacks are in!

It's Working!!!
Then I removed my chandelier, and the microjacks decided to keep the chandelier's adapter prongs along with the chandelier's wires!
Prongs and the wires from left side are gone - still stuck in Microjacks
So not only did I have to trash my chandelier (thank goodness I used a cheaper fan light to test and not my $150 chandelier!), but I had to rip out that pair of microjacks too since prongs were stuck in them!  So, I didn't want to do it, but I have decided to use tapewire in the Guest Room.  I will try using the microjacks without tails (so no soldering).  Microjacks without tails just push into my predrilled holes in the tapewire, so this should be easy.  I ran the tapewire into the Guest Room and put the microjack on the awl pin (as directed by the manufacturer for installing microjacks).  And pushed it into the 1/16" hole I had drilled.  And removed the awl from the room to discover the awl pin was still stuck into the ceiling with the microjack.  Are you kidding me?!?!  Using pliers I finally pulled the awl pin out of the ceiling, along with half of a microjack.


Yup, that's right: a third pair of microjacks destroyed!  WHAT IS IT WITH THE GUEST ROOM AND MICROJACKS?  The Guest Room must be cursed.  I have walked away from the project for a while so I don't throw it out a window.  My patience was exhausted.  And it was only Monday!

So, since I'm not working on my personal project, I will get lots done on customers projects!
The little blue Willoway needs tapewire put in it.  A simple 2 day project.  Nice and easy, straight tapewire runs across floors and ceilings (everything will get covered with wallpaper and flooring so no restrictions on where I put tapewire!).  Until I looked in the house on Saturday afternoon last week and discovered the customer had crown molding in all the rooms already!  And it was glued on solid; no removing it.  Might even have been part of the construction process.  And Dad primed over it all so it was also painted in place too (even if the glue had been weak, the paint would hold it tight).
Crown molding blends in with walls (Crown is where arrows are), but it is in every room
So I had to get creative with the wiring.  In order to get the electrical power from one room to the next, this dollhouse now has a hybrid of round wire and tape wire.  So first thing Tuesday I decided to tackle the electrical:
Some round wires can still be seen (see arrows) but will be tucked away once decorating starts
Many spots needed to be soldered - but trying to solder the wires behind the trim (where the arrows pointing up are located in the picture) was difficult: First, my head and hands couldn't fit into the space to see what I was doing or where I needed to solder.  The windows were too far back on the side for me to peek in too.  So I needed to use a mirror and solder backwards in the mirror.
Because holding a mirror, solder, and a soldering iron while trying to solder backwards is so easy to do.

Then came the next challenge: the solder kept dripping down the soldering iron.  Yup, that's how gravity works.  Just because I want the solder to melt up into the place where the grommets and wires are, gravity insists it must flow the other way, down the soldering iron tip and towards my hand.  Wonderful. So the house had to be tipped onto it's side so that the melted solder would flow into the hole and not down the iron.
So I ended up having to solder, sideways and backwards in a mirror balanced on a spare piece of trim.  Very nerve wracking and used up a lot of my patience.
But it's done!
But I haven't tested it yet . . . because if there were problems I wouldn't have had the patience to fix it this week!