Left Front Opening Panel when customer brought it in: as a child, customer had painted over the original green paint with red paint. Mullions werre missing from windows above. |
Left Panel "Finished": Green is on! Trims that were green have been restored to green again. Mullions were repaired with wood. Exterior is completed painted white. |
Now on to the mullions (the wood bits that create the "panes" on the windows). At first glance, the house was missing a lot of mullions. But once I started to work on the house, I realized that almost all mullions were missing! Someone along the way had "repaired" missing (or broken) mullions with strips of paper. Once I removed those flimsy replacement parts I had to cut new pieces out of wood strips. In addition to the windows on the Left Front-Opening Panel that I replaced/repaired, I have created the mullions for one full side so far:
The left side of the house as it was when customer brought it in to us. |
Left Side of the house: Mullions have been created for all the windows! (I still have to give the house body another coat of white and paint the trims green). |
In searching on the internet, I did discover a reference to a WWII German POW in a Gainesville, TX P.O.W. facility that built furniture (crib) and dollhouses! I was completely stunned by this as I was unawares that there were WWII German POWs on USA soil during the war! I have learned something new.
I still have to create more mullions for the other 2 sides of the house, paint the trims all green and fix up the "yard" a bit. And then the customer has added some minor interior work to be done. So it will still be another week or two of work.
But that is the current status of the WWII British POW house!